boiler replacement west kensington


After firing the boiler during operation

After firing the boiler, during operation at maximum output (2 to 4 loads), we heat the accumulation tanks to the requested temperature of 90 - 100°c then we let the boiler burn out after that, we take heat from the reservoir via a three-way valve, for a time period corresponding to the size of the reservoir and outside temperature in the heating period (provided that the minimum accumulator.

Added: 2018-06-15 | Category: boiler installations
Comments: 0